
Take a look at this beautiful T1 Samba bus ordered by a customer in ?? Germany ??. Click on the items in the list below to go to the desired section
- Stage 1: Arrival
- Stage 2: Stripping
- Stage 3: Protection
- Stage 4: Undercarriage Metalwork
- Stage 5: Floors (Video)
- Stage 6: Front Doors (Videos)
- Stage 7: Motor Compartment
- Stage 8: Metal Alignment (Video)
- Stage 9: Metal Sanding (Video)
- Stage 10: Paint Preparation
- Stage 11: Painting
- Stage 12: Assembly
- Stage 13: New Mechanics (Video)
- Stage 14: Engine (Video)
- Stage 15: Finished Chassis (Video)
- Stage 16: Finished Interior (Video)
- Stage 17: Finished Exterior (video)
- Stage 18: Exterior Accessories (video)
- Stage 19: Exterior Alignment (video)
Stage 1: Arrival
Here´s another Bus ready for the workshop. In a few months this will be a brand new Samba Bus! This bus was a really great base for a restoration. A rare find that will save us time when doing the metal work.
Stage 2: Stripping
Sandblasting and sanding the bus down to the metal for future stages.
Stage 3: Protection
After the stripping phase is done, the bus receives a rust protection coat for the remainder of the restoration to inhibit rust spots.
Stage 4: Undercarriage Metalwork
Our team works on changing all the cross-members. The Bus is supported by bars to ensure the outer shell does not lose its shape.
Stage 5: Floors
Now we are making some headway. After strengthening the undercarriage we can start laying the cross-members and get the floors fitted. As this bus was in great shape before the restoration all phases are moving along quite quickly.
Stage 6: Front Doors (Video)
The front doors must be meticulously restored as there are no longer any parts in production. This part really sets apart the professionals from the amateurs.
Stage 7: Motor Compartment
This bus was in very good shape and the motor compartment needed to restored rather than replaced.
Stage 8: Metal Alignment (Video)
Instead of changing all the metal, we try to repair and align what has not yet been completely destroyed.
Stage 9: Metal Sanding (Video)
Before we start the paint preparation, we make sure that the metal is cleaned of any extra residue that might interfere with the paint job. Here are some pictures of this process and videos of the sanding process and the finished bus before paint preparation.
Stage 10: Paint Preparation
During this process we apply a thin layer of filler to the body to ensure an even and smooth surface for painting.
Stage 11: Painting
Now the bus finally gets some character and gets a nice paint job. The customer opted for a blue underbody and lower half and a traditional white upper half and roof.
Stage 12: Assembly
After painting, we start installing a number of elements on the vehicle, such as windows and all chrome accessories ordered by the customer.
Stage 13: New Mechanics (Video)
Watch on YouTubeTake a look at the amazing new New Mechanics on this fantastic T1 Bulii. We have installed all new drum brakes, a new steering box, suspension and transmission. All the cables and hoses are brand new too and everything is tested first in the shop and then on the road.
We even installed an original VW heater!
Stage 14: Engine (Video)
Watch on YouTubeHere are some pictures of this newly restored 1.5 litre VW 4 cylinder engine. This engine has about 52 hp to reach a top speed of about 110 km/h.
Stage 15: Finished Chassis (Video)
Watch on YouTubeThis beautifully restored chassis shines! Check out the detailed welds and great finish.
Stage 16: Finished Interior (Video)
Watch on YouTubeThis project would not be complete without a completely new interior. The client wanted a camper bed, so we had to flip the middle bench seat over to face the back of the bus and allow room for the bed to open up. Now the bus has a very nice lounge setting.
Stage 17: Finished Exterior (video)
Watch on YouTubeHere is the complete 1975 Samba bus with all the options and chrome trim that the customer ordered.
Stage 18: Exterior Accessories (video)
Watch on YouTubeTake a look at the detailed finishing on this bus. All the trim, door handles, windows and other accessories are new.
Stage 19: Exterior alignment (video)
Watch on YouTubeAlignment the doors is a crucial part of the project. Check out the symmetrical lines on this fantastic project.

























































































































































































































































































































































































































































































































































































































































































































































































































