Customization – T1 Camper Bus – Brazil 1974 – Ref. T1007

with No Comments

Price upon request

Learn More About the Restoration Service

Take a look at this fantastic camper customisation project. We took this bus to our workshop and did a complete mechanical and structural inspection and then installed a camper interior. We then exported the bus to Antwerp and delivered the bus directly to the customer’s door in France.

Stage 1: base model

Here are some pictures of this model before it arrived at our workshop. We requested extensive information and pictures of the bus so that the customer could make an informed decision about the purchase.

Stage 2: Inspection

After the customer decided to buy the bus, we did a complete inspection of the bus and found that we needed to make some technical improvements. Here is a short list of what we needed to do.

  • Install new steering gear
  • Open up and check the gearbox
  • New shock absorbers
  • New engine seals
  • Improve sills
  • New paint underneath
  • New brake master cylinder
  • Change various cables and hoses

Stage 3 : Mechanical improvement

Here are some pictures of the technical improvements we made. We had to remove the engine to change the seals and also have a look at the gearbox.

Stage 4 : Structural improvement

We also did some work on the sleepers and partially repainted the lower half of the bus.

Stage 5 : Camper interior work

After all this work was done, we started with the interior, fitting everything according to the customer’s wishes. Here are some pictures of this work.

Stage 6 : Finished camper interior

This coach has a table, camper bed, fridge and sink and tap so the client can really enjoy the summer in style. There is also a lot of storage space.

Stage 7 : Finished exterior

The exterior as well as the interior are complete and we are ready for export! We then loaded the van into a container and tied it down for shipping.

Stage 8 : Arrival in Europe

After a 25-day journey at sea, the bus arrives in Europe. These pictures are after customs clearance and VAT. Now the bus is in our warehouse and ready for collection.

Stage 9 : Delivery to client

The project is now finished. And we have delivered the bus to our customer, where he can now enjoy it for the summer.